新风换气机 如何安装? 在介绍如何安装之前,我们卓耐环保设备厂家先介绍下什么是新风换气机?通过了解了新风换气机产品工作原理及产品结构后,我们介绍安装步骤。 How to insta...
新风换气机如何安装?
在介绍如何安装之前,我们卓耐环保设备厂家先介绍下什么是新风换气机?通过了解了新风换气机产品工作原理及产品结构后,我们介绍安装步骤。
How to install the fresh air ventilator?
Before introducing how to install, we zhuanai environmental protection equipment manufacturers first introduce what is a fresh air ventilator?
After understanding the working principle and product structure of fresh air ventilator, we introduce the installation steps.
 
什么是新风换气机
新风换气机工作原理是:产品工作时,室内排风和新风分别呈正交叉方式流经换热器芯体时,由于气流分隔板两侧气流存在着温差和蒸汽分压差,两股气流通过分隔板时呈现传热传质现象,引起全热交换过程。夏季运行时,新风从空调排风获得冷量,使温度降低,同时被空调风干燥,使新风含湿量降低;冬季运行时,新风从空调室排风获得热量,温度升高。这样,通过换热芯体的全热换热过程,让新风从空调排风中回收能量。
What is a fresh air ventilator?
The working principle of the fresh air ventilator is: when the product is working, the indoor exhaust air and fresh air respectively pass through the core of the heat exchanger in a positive cross way, because of the difference in temperature and the difference in steam partial pressure on both sides of the air flow separator, the heat and mass transfer phenomenon occurs when the two air flows over the separator, resulting in the total heat exchange process.
When running in summer, the fresh air gets cold from the air conditioning exhaust, so that the temperature is reduced, and the air conditioning is dry, so that the fresh air moisture content is reduced;When running in winter, the fresh air gets heat from the exhaust air of the air conditioning room, and the temperature rises.In this way, through the total heat transfer process of the heat transfer core, the fresh air can recover energy from the air conditioning exhaust.
 在讲解“新风换气机的安装步骤”之前,我们必须要注意以下几个要点
  1、管道打孔
  在安装新风系统的时候需要对墙体进行打孔,打孔的目的利于管道的走向,因此打孔一定要在主机安装前完成,一般最好在施工前一天进行完毕为佳,如果是用户装修完毕的房屋,打孔前一定要做好防护工作,孔径的大小是根据管道的尺寸来确定,位置要根据施工图纸以及现场实际情况定位准确。
  2、风口安装
  对于整屋采用新风系统的方案,建议一个房间采用一进风一出风形式,而且安装位置在对角线。风口的安装位置应符合设计图纸的要求,进风口要尽量安装在易于安装的位置,尽量避免死角,使新风与室内污浊空气形成循环系统,保持室内空气的持续循环流通;排风口安装于卫生间及走廊吊顶上,室内空气通过排风口进入主机,再通过主机排向室外。排风口和进风口最好保持2m-3m的距离,以保证交换的空气不会混在一起。
  3、开机调试
在新风系统工程安装完毕后,就需要进行机器的调试,调试的内容主要包括运转前各项安全检查,新风机组主外机中的风机的试运转,查看新风系统是否运转平稳,有无异常振动与声响,最后调试结果由业主验收。
Before explaining the "installation steps of fresh air ventilator", we must pay attention to the following points:
1, pipeline drilling
When installing new air circulating system need to punch the wall, punch for the purpose of the pipeline, so the holes must be in the host before installation is complete, generally best is better the day before the construction completed, if the user is renovated house, must do a good job protection, before punching the aperture size is determined according to the size of the pipeline,
The location should be located accurately according to the construction drawings and the actual situation on site.
2. Tuyere installation
For the whole house using fresh air system scheme, it is suggested that a room with an incoming air and an outgoing air form, and the installation position is on the diagonal.
The installation position of the tuyere should meet the requirements of the design drawings. The air inlet should be installed in a position easy to install as far as possible, and try to avoid dead corners, so that the fresh air and the indoor dirty air form a circulation system, and maintain the continuous circulation of indoor air.
The air outlet is installed on the ceiling of the bathroom and corridor. The indoor air enters the main engine through the air outlet and then exhausts to the outdoor through the main engine.
It is best to keep a distance of 2M-3m between the exhaust outlet and the air inlet to ensure that the air exchanged will not be mixed together.
3. Startup debugging
After the installation of the fresh air system project, it is necessary to carry out the debugging of the machine, which mainly includes the safety inspection before operation, the test run of the fan outside the main machine of the fresh air unit, and check whether the fresh air system is running smoothly, whether there is abnormal vibration and sound, and the final debugging result is accepted by the owner.
 
  卓耐环保设备厂家介绍,新风换气机的安装步骤
  1、安装之前检查所有零部件是否齐全,断开所有电源以免发生触电事故,仔细阅读安装说明书,确定好要安装的位置等等,做好安全措施;
 
  2、本体的安装请将附属品风口安装在风口上,使用25系列附属螺钉12个,安装一个风口用3个螺钉,50系列有24个,安装一个风口用6个螺钉。一共要安装4根吊装螺栓,要注意适当调整吊装螺栓长度,以确保本体下面与天花板之间的空间在25mm以上,本体上面与吊装螺栓的安装面之间的空间在20mm以上;
 
  3、把本体的吊装部件安装到吊装螺栓上请一定要保证室外的方向无误,一定不要颠倒上下安装,固定好螺母、垫圈。将本体水平安装,将风道插入各接续口,并用胶带密封好。进行风道施工时,请不要用手碰到风机,与室外侧连接的管道,安装时要与室外倾斜,防止雨水入侵。与室外连接的管道,外壁一定要做好保温处理;
 
  4、安装注意事项使用断开触点在3mm以上的开关,额定电流在10A以上的开关,电源线和开关的连接线都要取得CCC的认证,请使用GB5023.5的规定的额定电压为300V/500V的电压,电源线请使用包括黄绿线在内的3芯线,并且各线芯的公称截面积为2.5mm规格。另外本体内的开关连接线及SW1,SW2,请使用2芯线,各芯线的公称截面积与之前的一样。
 
新风换气机如何安装?以上就是小编今天给大家分享的关于新风换气机如何安装的详细解说,新风换气机的安装要注意管道打孔、风口安装和开机调试这几个比较重要的细节点! 
How to install the fresh air ventilator?
The above is xiaobian today to share with you a detailed explanation of how to install the new air ventilator. The installation of the new air ventilator should pay attention to the pipe drilling, the tuyere installation and the startup debugging of these several more important details! (责任编辑:admin)

http://www.zhuo-nai.com/newscompay/newscompay-283.html

卓耐环保二维码生成器
新风换气机
分享按钮